Communication related to data exchange in the German power markets (MaKo) must be handled between involved parties through AS4 web services by latest 1st April 2024. The exchange of power scheduling messages with the German TSOs is due to be switched from encrypted email to AS4 web service by 1st December 2024 the latest. For gas nominations and market communcition the deadline is the 1st of April 2025
dispoConnect AS4 is the simple solution for Balance Responsible Parties to manage a frictionless switch-over to the new AS4 communication standard in Germany.
If your company exchanges power schedule messages with the German TSOs Amprion, 50 Hertz, TransnetBW or TenneT, you are a balance responsible party and affected by the changes outlined below:
Starting latest 01.04.2024 you need to be able to receive the MaBiS EDIFACT messages (MSCONS, PRICAT), which are currently sent to you by encrypted and signed email, via AS4 Protocol. There will be no alternative channel to receive those messages.
Latest by 01.12.2024 your power schedule message exchange (ESS) with the TSOs must be switched from encrypted email to AS4 as well. This applies to all scheduling messages (Schedule, Acknowledgement, Confirmation, Anormally Report).
A Unified AS4 Platform for MaKo and Scheduling Transactions connecting to all TSOs. Built cloud-native on Microsoft Azure.
We are running 24/7 AS4 communication for the Gas Market all accross Europe. All our experience from this went into building dispoConnect AS4 connect!
dispoConnect AS4 connect implements the BDEW AS4 profile and the BSI Smart Metering PKI requierements for passive EMTs.
Integrate your current Energy Data Management and Scheduling tools through Data Streaming, REST API or sFTP
Gain a full overview of your in- and outbound messages via our SaaS-App, featuring single sign-on and Azure Active Directory integration.